  • T-0824

    Broadway Boulevard Pavers Replacement

    Improvements to the Broadway Blvd crosswalk pavers at the intersections of Santa Elena Street, Bellfort Street, Rockhill Street, and Morley Street. Including the replacement of existing sand bed brick pavers with new reinforced concrete that is stamped [...]

  • T-0803

    MLK and Airport Blvd Intersection Improvements

    Houston Parks Board purchased the 1.84 acre parcel of land adjacent the Family Dollar on the NE corner of the MLK and Airport Boulevard intersection. In partnership with the Gulfgate Redevelopment Authority/ TIRZ 8, the parcel was [...]

  • T-0817

    Mosley Road Improvements (District I)

    The project consists of 3100 LF complete roadway rehabilitation improvements from Scranton St to Airport Blvd. The scope of the project includes preparatory work for sampling and analysis on Potentially Petroleum Contaminated Areas (PPCA), [...]

  • T-0809

    Park Place Entry Pre-Ticketed Area – Botanic Garden (District I)

    The project consists of amenities and improvements in the pre-ticketed area outside the Houston Botanical Gardens including a picnic grove with landscape, stormwater wetlands, pedestrian lighting and educational signage. This project represents [...]

  • T-0806

    Telephone Rd & Reveille Rd Connections (District I)

    The Army Corp of Engineers constructed a trail along Sims Bayou Greenway from Reveille Park to Robert C Stuart Park. In partnership with the Gulfgate Redevelopment Authority/ TIRZ 8, this project provided new neighborhood trail connections [...]

  • T-0804

    Mykawa Road and CenterPoint Easement Trail (District D)

    The FM Law Park Connector Trail provides communities north of the park with a safe connection to FM Law Park and the Sim’s Bayou Greenway. The 10 foot wide concrete trail begins at Doulton Drive and runs south to Vassar Road with a new [...]