Current Projects
Current Projects
T-0827
Houston Botanic Garden Public Infrastructure Improvements
The project includes improvements to existing public infrastructure necessary for the continued operations of the Houston Botanic Garden and the surrounding area, as well as upgrades and enhancements to the Pre-Ticketed Area to support visitor experience, accessibility, and overall facility functionality.
T-0810
Charlton Park and Community Center Improvements
The second phase of Charlton Park will transform the park by introducing an array of enhancements. These include expanding the playground, establishing a central shade pavilion and event lawn, improved pedestrian circulation and loop trails, [...]
T-0821
Long Drive Mobility and Safety Improvements
This project will involve roadway replacement from S. Wayside to Telephone Rd. to provide adequate sidewalks. Construction is to begin in FY 2026 and be completed by FY 2027.
T-0816
Dixie Road Mobility (Mykawa to Chaffin St.)
T-0816 This project involves the complete replacement of the existing roadway with reinforced concrete and new curb, along with a series of infrastructure upgrades designed in accordance with City of Houston (COH) standards. Improvements [...]
T-0819
Safe Sidewalks (District I)
Specific sidewalk projects that enhance pedestrian safety and connectivity between neighborhoods and key destinations in the zone. The project is in the design phase and slated to start construction in 2026. The project was awarded a $1.6 million federal grant.
T-0811
Parks and Green Space Improvements
The enhancement and beautification of existing parks and pedestrian spaces as well as development of a new park and greenspaces per the Parks Master Plan developed by Clark Condon Landscape Architects in 2021. This project is being [...]
T-0812
Madden Lane Improvements (Districts D, I)
Improvements to 4,600 LF of roadway from Martindale to Mykawa Road to convert the existing asphalt roadway to a 27ft-wide asphalt road with concrete monolithic curbs and gutters and the existing roadside ditches to a combined drainage system [...]
T-0813
Telephone Rd Mobility (Plumb Creek Dr to Reveille) (Districts D)
8,500 LF of complete street improvements along Telephone Road between IH-610 EB Frontage Road and Reveille Street. Improvements include upgrades to the roadway, driveways, sidewalks/bike lanes, drainage, public utilities, traffic signals, [...]
T-0808
Public Improvements Along Park Place Blvd. (District I)
1-mile roadway resurfacing project along Park Place Boulevard from IH-45 and SH 3 to promote redevelopment throughout the Gulfgate District. The project included roadway resurfacing, new 8-foot wide sidewalks on both sides of the road, [...]
T-0802A
Multistreet Mobility Improvements (Districts D, I)
T-0802A Multiple street projects throughout the zone which provide an immediate community impact. Since 2019, $10.2 million of corridor improvements that include pavement panel replacements, curb replacement, pavement markings and replacement of [...]

